FIB logo
FIB logo
  • Home
  • News
  • Cutting off water consumption in the rinsing bath after the HCl pickling process

Cutting off water consumption in the rinsing bath after the HCl pickling process

FIB has developed a high-performance configurable rinsing bath that may be mounted easily on existing hydrochloric acid pickling baths.

This new design reduces the rinsing water consumption by 2 to 3 times and consequently the volume of reactive for the wastewater treatment. Examples show that we speak in some cases of thousands of m³ water per year (9500 m³ in our example: the equivalent of 2,5 olympic swimming pools) !

 

iwma  agoriacecof

             

 

FIB BELGIUM S.A
Avenue Landas 4
Industrial Zoning Saintes
B-1480 TUBIZE - BELGIUM
Tel: +32 (2) 332 17 17
Fax: +32 (2) 376 37 11

fib logo

Ahead Together !

info@fib.be
www.fib.be